MOMB Handover Certificate

SATISFACTORY COMPLETION AND 

HANDING OVER CERTIFICATE

NAME OF WORK: STRENGTHENING OF INFRASTRUCTURE FACILITIES TO MPPS/ZPHS AT ……………………………………………………. DISTRICT UNDER MANA OORU MANA BADI /MANA BASTHI MANA BADI PHASE-1

Administrative sanction:

Proce.No.Rc.No:………………….,dt;…………….. of district collector & District magistrate,…………………. District

Agreement No.:

 

Estimated Cost:

 

 

The is to certify that Strengthening of infrastructure facilities to MPPS/ZPHS……………………………Mandal:………………………., ………….………….district under mana ooru mana badi /mana basthi mana badi phase-1 Executed by TSEWIDC ……………………. Agency SMC committe Completed satisfactory in all aspects ..The Strengthening of infrastructure facilities to MPPS/ZPHS……………………………Mandal:………………………., ………….………….district  completed as per the following specifications.

1)    Major and minor repairs

·         Construction of sump and Drinking water platform with 1.00 Hp motor

·         Renovation of Existing  toilets with ceramic flooring and dadooing  with complete running water connections

·         Pvc Doors- 2 nos

·         Ms grills

·         Urinals- 3 nos

·         Water tank- 500 ltrs

·         Window Shutter-2 nos

·         Impervious coat for old building

·         External plastering for old Building

2)    Electrical Works

·         New wiring

·         Modular switches

·         Tube lights – 10 no’s

·         Holders- 10 nos

·         Fans –8 no’s

The above works have been completed satisfactorily in full shape and handed over in good working condition. For Strengthening of infrastructure facilities to MPPS/ZPHS……………………………Mandal:………………………., ………….………….district  Constructed have been handed over for occupation

 

 

Handed Over                                                                                                    Taken Over